Kitchen gut, bathroom gut, wall removal, full interior strip-down. Sealed dust control, clean handoff to your GC, debris hauled. From $1,800.
Interior demolition in Rockwall, TX runs $1,800 to $12,000. A single non-load-bearing wall removal starts at $1,800 to $2,500. A full kitchen gut (cabinets, counters, flooring, drywall) averages $3,500 to $6,500. A full bathroom gut averages $2,800 to $4,500. Whole-house interior strip-down runs $8,000 to $12,000 depending on square footage.
We leave the demo zone clean and ready for the next trade.
| Project | Scope | Typical price |
|---|---|---|
| Single non-load-bearing wall | Wall + debris + dust control | from $1,800 |
| Bathroom gut | Fixtures, tile, drywall, vanity | $2,800–$4,500 |
| Kitchen gut | Cabinets, counters, flooring, drywall | $3,500–$6,500 |
| Open-concept project | 2–3 walls + ceiling patch prep | $4,500–$7,500 |
| Whole-floor strip | 1,500–2,500 sq ft | $6,500–$9,500 |
| Whole-house gut | 2,500–4,000 sq ft | $8,000–$12,000 |
We seal off the demo zone with floor-to-ceiling poly sheeting and zip-doors, run negative-air HEPA filtration during the gut, and tarp the path from the demo zone to our dump trailer in the driveway. Adjacent rooms stay clean and livable in most occupied-home scenarios. If you have kids, pets, or asthma, this matters, and it costs us labor most contractors don't include.
We will cut a load-bearing wall when you have an engineered support plan from a licensed structural engineer or your GC. The plan specifies the beam size, the bearing points, and the temporary shoring during demo. We do the demo and the temporary shoring; the permanent beam install is handled by a framer (we can recommend one in Rockwall).
What we won't do: cut a load-bearing wall without a plan. The risk is a partial roof or floor collapse, and no quote is worth that.
Interior demo runs $1,800 to $12,000. Single wall from $1,800. Kitchen gut $3,500 to $6,500. Bathroom gut $2,800 to $4,500. Whole-house strip $8,000 to $12,000.
Yes, with an engineered support plan from a structural engineer or your GC. Without the plan, no, the risk of partial collapse is real.
Yes. Poly sheeting and zip-doors seal off the demo zone, HEPA negative-air filtration runs during the gut, and we tarp the haul path. Adjacent rooms stay livable.
Yes. We coordinate scope, timing, and rough-in handoffs with your GC, plumber, electrician, and designer so the next trade starts the day after we finish.
Most Rockwall-area cities require a permit when plumbing, electrical, or load-bearing walls are touched. Cosmetic demo (cabinets, flooring, counters) usually doesn't. We confirm and pull it when required.
Single wall: 1 day. Bathroom gut: 1 to 2 days. Kitchen gut: 2 to 3 days. Whole-house strip: 5 to 10 days.
Send your plans, your designer's spec, or just photos of the rooms. We will walk it with you and your GC and quote within 24 hours.
The website shares information with local, licensed, and insured vendors who will reach out and contact you the consumer with the information provided here.